Improper grading on this rooftop patio lead to water ponding and subsequent damage to the front facade on this multi family property.
First step was to remove existing membrane 40” from the front parapet wall across the entire width of the building- so the concrete could be re graded
Once removed we used Sika Quick 1000 to re slope the concrete to drain to the scuppers. This product allowed membrane to be re installed within 24 hours for fast turn around.
This process was completed in 5 days from start to finish.